翻訳と辞書
Words near each other
・ Schuyler Carron
・ Schuyler Chapin
・ Schuyler Colfax
・ Schuyler Copper Mine
・ Schuyler County
・ Schuyler County Courthouse Complex
・ Schuyler County, Illinois
・ Schuyler County, Missouri
・ Schuyler County, New York
・ Schuyler Enck
・ Schuman Collection
・ Schuman Declaration
・ Schuman roundabout
・ Schuman station
・ Schuman tunnel
Schuman-Josaphat tunnel
・ Schumann
・ Schumann Center for Media and Democracy
・ Schumann Nunatak
・ Schumann resonances
・ Schumannianthus
・ Schumannianthus dichotomus
・ Schumanniophyton
・ Schumanniophyton problematicum
・ Schumanns Nat
・ Schumann–Runge bands
・ Schumansville, Texas
・ Schumer
・ Schumer box
・ Schumm test


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Schuman-Josaphat tunnel : ウィキペディア英語版
Schuman-Josaphat tunnel

The Schuman-Josaphat tunnel is a double track rail tunnel being constructed in Brussels.〔(【引用サイトリンク】title=Schuman-Josaphat tunnel )〕 It will link line 161 (Brussels-Namur) just after Meiser station and line 26 (Halle-Vilvoorde) at the Cinquantenaire/Jubelpark tunnel just before Schuman station. The line will be numbered L161A. A key component of the Brussels RER project, it will pass beneath avenue Plasky/Plaskylaan, place de Jamblinne de Meux/Jamblinne de Meuxplein and the Cortenbergh/Kortenberg road tunnel.〔(【引用サイトリンク】title=Schuman-Josaphat tunnel )〕 The position of the tunnel in the Brussels rail network is shown in the simplified map on the right. Benefits of the project include:
* reducing the journey time from the European quarter (Schuman and Luxembourg stations) to the airport from half an hour to less than 15 minutes by opening a direct route and avoid having to change at Brussels North station〔(【引用サイトリンク】title=The Regional Express Network )
* opening a parallel route through Brussels to take pressure off the saturated Brussels North - Brussels South line
==Project details==

The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. was scheduled to last from late 2010 to late 2013. In fact track laying began in 2014.
The tunnel is expected to be officially opened on 12 December 2015.〔(【引用サイトリンク】title=Licht aan het einde van de Schuman-Josafattunnel: opent over 100 dagen )〕 The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the Brussels Region. The project is also managed by Infrabel.
Unusual construction techniques were used to limit disturbance to local residents and protect the appearance of Brussels. It was decided to carry out the work without opening the tunnel from the surface so the digging is being done without a tunnel boring machine, but rather by hand or using small excavators. The Cortenbergh road tunnel was built with extra deep foundations to accommodate a future rail tunnel beneath it. Elsewhere the tunnel passes close beneath the cellars of buildings, and in any case delivering a TBM in central Brussels would have created great disruption. Similar techniques were used during the construction of the underground junction passing under the Antwerp Central railway station.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Schuman-Josaphat tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.